The Helen Johnson project reduced irrigation withdrawals from the mainstem of the Upper Clark Fork by over 15 cfs on three ranches. It removed a fish barrier and eliminated entrainment issues. The project replaced a portion of the ditch on the Lampert Ranch with a 2-mile stock water pipeline that uses significantly less water.
Contractors: TetraTech, Pivots Plus